Prismatic lithium battery pack assembly line
Prismatic lithium battery pack assembly line
Product Description
After the product flows from the double-speed chain to this station, the OCV test is performed first to ensure that the voltage and impedance meet the product process requirements;
Prismatic lithium battery pack assembly line Design Information:
Blueprint: Based on 1P8S module PACK
No
Model
Parallel series type
Size(L*W*H)mm
type
Remark
1
EVE 280Ah
1P8S
(blueprint)
In addition to the blueprint, additional tooling, pallets, etc. are required for compatibility, which is a value-added service
OCV test and NG removal station introduction:
After the product flows from the double-speed chain to this station, the OCV test is performed first to ensure that the voltage and impedance meet the product process requirements;
After the OCV test is completed, enter the next NG removal station, and the NG products will be placed on the NG product conveyor belt through the three-axis handling module to flow out; the OK products are stored in the refilling position, waiting for refilling;
Flip gripping and manipulator gluing station introduction:
After the product completes the OCV test, the station is driven by the double-speed chain, and after passing the polarity test, the product is clamped and turned over;
After turning over, go to the next manipulator gluing station to automatically gluing the battery cells
More about Lithium Battery Module Pack Assembly Line, please contact us.