• $1000

Prismatic lithium battery pack assembly line

Prismatic lithium battery pack assembly line

Product Description

After the product flows from the double-speed chain to this station, the OCV test is performed first to ensure that the voltage and impedance meet the product process requirements;

Prismatic lithium battery pack assembly line Design Information:

Blueprint: Based on 1P8S module PACK

No

Model

Parallel series type

Size(L*W*H)mm

type

Remark

1

EVE 280Ah

1P8S

 

(blueprint)

 

In addition to the blueprint, additional tooling, pallets, etc. are required for compatibility, which is a value-added service

OCV test and NG removal station introduction:

After the product flows from the double-speed chain to this station, the OCV test is performed first to ensure that the voltage and impedance meet the product process requirements;

After the OCV test is completed, enter the next NG removal station, and the NG products will be placed on the NG product conveyor belt through the three-axis handling module to flow out; the OK products are stored in the refilling position, waiting for refilling;

Flip gripping and manipulator gluing station introduction:

After the product completes the OCV test, the station is driven by the double-speed chain, and after passing the polarity test, the product is clamped and turned over;

After turning over, go to the next manipulator gluing station to automatically gluing the battery cells

More about Lithium Battery Module Pack Assembly Line, please contact us.